Essential Viewing TVI C300 Guide d'installation

Naviguer en ligne ou télécharger Guide d'installation pour Serveurs Essential Viewing TVI C300. Essential Viewing TVI C300 Installation guide Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 12
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
Installation Guide
Network Encoder Model TVI C300
Vue de la page 0
1 2 3 4 5 6 ... 11 12

Résumé du contenu

Page 1 - Installation Guide

Installation GuideNetwork Encoder Model TVI C300

Page 2 - Hardware Overview

Fault ChecklistAfter 30-90 seconds (depending on the communications device) the Network Encoder should befully powered and connected to the Network Se

Page 3 - Installing the TVI Encoder

I/O Terminal (RS485/422/Alarm/DC): Provides RS485/422 data connections, an alarm inputconnection and an additional DC power input.Figure 4: I/O Termin

Page 4

Contact DetailsFurther information on the installation and operation of the TVI C300 Encoder isavailable online at http://support.essential-viewing.co

Page 5

Installation GuideThank you for purchasing your new TVI C300 Encoder.The package you have received contains everything you need to set up an infrastru

Page 6

Installing the TVI EncoderThe TVI Encoder has been designed to be used in indoor environments (or outdoor when located ina suitable housing) and has f

Page 7

Step 1: USB PenInsert the USB Pen Drive into a spare USB socket on a PC running MS Windows XP/Vista.Depending on your computer's configuration Wi

Page 8 - Boot Process

Step 4: Encoder Name and Server AddressStep 5: Encryption and Authentication Standard LAN (RJ45) Connection The Encoder will connect to any network

Page 9

Step 6: Encoder Time ZoneStep 7: VPN Configuration Select the Time Zone on the Encoder correctly sothat the video playback time displayed in thev

Page 10 - Network Encoder Connectors

Step 8: Network Configuration (LAN only)Step 9: Mobile Network Configuration (3G only)The predefined settings are correct as of January 2009 and may b

Page 11 - RS485/422

Step 10: Eject Pen DriveOnce the appropriate settings have been entered hit the ‘Finish’ button to close the wizard. Followthe given instructions on

Page 12 - Contact Details

Once all three phases are complete the Encoder should show three solid green lights. This signifiesthat the Encoder is now connected to its Network Se

Commentaires sur ces manuels

Pas de commentaire